
Most residential jobs: 1–3 days
Asbestos Removal Brisbane, Gold Coast & Sunshine Coast
Roof sheeting, eaves, wet areas, vinyl and pipe lagging — removed under Queensland WHS regulations, disposed of at licensed facilities, with a clearance certificate.
What's included
One crew. Start to finish.
- Class A & B licensed
- Air monitoring where required
- Licensed disposal with receipts
- Independent clearance certificate

Licensed Class A and Class B removal
Asbestos was used widely in Australian homes and buildings until the late 1980s. Left alone and in good condition it's generally low risk, but once it's broken, drilled, sanded or weathered, it can release fibres that cause serious lung disease.
We hold both licence classes, so we can remove any type of asbestos: Class B for bonded (non-friable) materials, and Class A for friable materials such as pipe lagging, sprayed insulation and some vinyl backings.
Where we find it
In South East Queensland homes and commercial buildings, the most common places are:
- Fibro roof sheeting, eaves and wall cladding
- Wet-area wall linings behind bathroom and laundry tiles
- Vinyl floor tiles and sheet vinyl backing
- Fences, sheds and garages
- Pipe lagging, flues and old hot-water systems
- Soil and fill on sites where asbestos materials were buried or broken up
When a licence is required
Under Queensland's work health and safety laws, removing more than 10 m² of bonded asbestos needs a licensed removalist, and any amount of friable asbestos needs a Class A licence. Even for smaller areas, a licensed contractor is the safest option: the material has to be wetted, wrapped, transported and disposed of correctly, and a mistake can contaminate the rest of the property.
How a removal job runs
- Site inspection to confirm the material, quantity and access
- Work area set up and isolated, with air monitoring where required
- Material wetted, removed intact where possible, wrapped and sealed
- Transport to licensed disposal facilities, with receipts for every load
- Independent clearance inspection and certificate before the area is reopened
Asbestos removal before demolition or renovation
Asbestos must come out before a building is demolished, and before renovation work disturbs it. Because we also do the demolition, the two stages fit together: asbestos removal typically takes 1–3 days, the clearance certificate is issued, and demolition starts straight after with the same company managing both.
Contaminated soil and fire-damaged buildings
Where asbestos is broken up in soil, or a fire or storm has damaged an asbestos-containing building, the job is bigger than sheet removal. We excavate and dispose of contaminated soil and work alongside environmental consultants where testing or validation is needed. For fire-damaged, asbestos-contaminated homes, we handle the asbestos removal and the demolition as one job.
Starting prices
Asbestos removal
From $300 / m³ + GST
Bonded or friable, by licensed Class A & B removalists.
Fire-damaged, asbestos-contaminated home
From $35,000 + GST
Licensed asbestos removal plus demolition of the damaged structure.
How it runs
Real steps. Real timeframes.
- 01
Enquiry
Reply within 2 business hours
Call, book online or send a quote request. A real person — not a call centre — gets back to you.
- 02
Site inspection
Within 48 hours
We walk the site, identify asbestos, access, services and neighbours, and confirm your timeline.
- 03
Quote reviewed & sent
Within 24 hours of inspection
Every quote is checked and approved by a senior reviewer before it reaches you. Fixed price, itemised, no surprises.
- 04
Permits & disconnections
Usually 5–10 business days
We lodge the demolition permit and coordinate power, water, gas and sewer disconnections.
FAQs
Frequently asked questions
How much does asbestos removal cost?
Asbestos removal starts from $300 per m³ + GST, for bonded or friable material. Access, quantity and the type of asbestos affect the price. We confirm a fixed price after inspecting the site.
Can I remove asbestos myself in Queensland?
Queensland law requires a licensed removalist for more than 10 m² of bonded asbestos and for any friable asbestos. Even for small amounts, licensed removal avoids spreading fibres and makes sure disposal is legal.
What's the difference between Class A and Class B asbestos removal?
A Class B licence covers bonded (non-friable) asbestos such as fibro sheeting. A Class A licence covers friable asbestos, which crumbles easily and releases fibres more readily. We hold both.
Do I get a clearance certificate?
Yes. After removal, an independent clearance inspection is done and you receive a clearance certificate along with the disposal receipts.
How long does asbestos removal take?
Most residential jobs take 1–3 days. Larger commercial or friable removals are scoped at the site inspection.
Is my home likely to contain asbestos?
If it was built or renovated before 1990, it's likely to contain some asbestos. A site inspection confirms where it is before any demolition or renovation starts.
Guides & advice
Related services
Areas we cover
Fixed-price quote. Reviewed before it reaches you.
Servicing Sunshine Coast, Brisbane and Gold Coast, and everywhere in between.
