
Programmed to your build schedule
Commercial Demolition Brisbane, Gold Coast & Sunshine Coast
Builders and developers use us because we run the whole scope: SWMS, traffic management, staged strip-outs and structural demolition, on programme.
What's included
One crew. Start to finish.
- Safe Work Method Statements
- Soft strip & internal fit-out removal
- Structural demolition
- Recycling & waste tracking

Built around your programme
On a commercial site, demolition is usually the first item on someone else's critical path. Builders and developers need a contractor who plans properly, turns up when programmed, and hands over a compliant site on the agreed date.
We run the full demolition scope ourselves: safety documentation, traffic management, soft strip, hazardous materials, structural demolition and waste tracking. That means one point of contact and one programme, not several subcontractors to coordinate.
Projects we take on
- Offices, shops and shopping-centre tenancies
- Warehouses, factories and industrial sheds
- Multi-unit residential and mixed-use buildings
- Internal strip-outs and fit-out removal for refurbishment
- Fire-damaged and asbestos-affected commercial buildings
- Slabs, hardstand, car parks and below-ground structures
Safety planning and documentation
Every commercial job starts with site-specific Safe Work Method Statements covering the high-risk work involved: structural demolition, working at height, plant movements, and asbestos. Where the site borders a road or footpath, we plan traffic and pedestrian management so the public and your other trades stay clear of the work zone.
If you need SWMS, a demolition plan or hazardous-materials information for your principal contractor or certifier, we provide it before mobilisation.
Staged soft strip and structural demolition
We work in stages. First comes the soft strip: fit-out, ceilings, partitions, services and anything salvageable. Any asbestos or other hazardous materials are then removed by our licensed team. Structural demolition comes last, so materials stay separated and recycling rates stay high. For occupied or partly occupied buildings, we can sequence work around tenants and agree noise and dust controls with you.
Waste tracking and recycling
Concrete, steel, timber and general waste are separated on site and tracked to licensed facilities. Asbestos is transported and disposed of as regulated waste, with receipts kept for every load. At completion you receive the paperwork your project's environmental and compliance reporting needs.
Excavation straight after demolition
Our excavators and trucks can move straight from demolition into bulk excavation, site cuts and spoil haulage. One builder had us handle the demolition permit, the full building demolition and a 1,500 m³ bulk excavation as a single scope, with no gap between trades.
Starting prices
Commercial building demolition
From $50,000 + GST
Shops, offices, warehouses and strip-outs.
How it runs
Real steps. Real timeframes.
- 01
Enquiry
Reply within 2 business hours
Call, book online or send a quote request. A real person — not a call centre — gets back to you.
- 02
Site inspection
Within 48 hours
We walk the site, identify asbestos, access, services and neighbours, and confirm your timeline.
- 03
Quote reviewed & sent
Within 24 hours of inspection
Every quote is checked and approved by a senior reviewer before it reaches you. Fixed price, itemised, no surprises.
- 04
Permits & disconnections
Usually 5–10 business days
We lodge the demolition permit and coordinate power, water, gas and sewer disconnections.
FAQs
Frequently asked questions
How much does commercial demolition cost?
Commercial building demolition starts from $50,000 + GST. The final price depends on building size, construction type, hazardous materials, access and staging. We quote a fixed, itemised price after inspecting the site.
Do you provide SWMS and a demolition plan?
Yes. Every commercial job has site-specific Safe Work Method Statements, and we supply demolition and safety documentation to your principal contractor or certifier before we mobilise.
Can you do internal strip-outs only?
Yes. We do soft strips and fit-out removal for refurbishments, as well as full structural demolition.
Can you work around our build programme?
Yes. We programme the demolition to your schedule and can roll straight into excavation and spoil haulage with the same crew and machines.
How is demolition waste handled?
Materials are separated on site for recycling and tracked to licensed facilities. Asbestos is disposed of as regulated waste, and you receive receipts for every load.
Guides & advice
Related services
Areas we cover
Fixed-price quote. Reviewed before it reaches you.
Servicing Sunshine Coast, Brisbane and Gold Coast, and everywhere in between.
