Typical house: 2–5 days on site

Residential Demolition Brisbane, Gold Coast & Sunshine Coast

Knock-down-rebuild, subdivision or a clear block to sell — we handle the permit, disconnections, asbestos and the demolition itself, then hand back a clean, level site.

What's included

One crew. Start to finish.

  • Demolition permit & council lodgement
  • Service disconnections coordinated
  • Asbestos removal by our own Class A & B team
  • Full site clean & level on handover
Residential Demolition

House demolition without juggling trades

Most people only demolish a house once, so it's easy to underestimate how many moving parts there are: a building approval, disconnecting power, water, gas and sewer, finding and removing asbestos, the demolition itself, and then getting rid of the waste. Hire separate contractors for each and you become the project manager.

We handle all of it with one crew. We lodge the demolition approval, coordinate the disconnections with each provider, remove the asbestos with our own Class A and B licensed team, take the house down and hand you back a clean, level block your builder can start on.

What we demolish

Full knock-down-rebuilds are the bulk of our residential work, but we also take on smaller and partial jobs:

  • Single and double-storey houses, timber, brick or fibro
  • Fire- and storm-damaged homes, including asbestos-contaminated structures
  • Partial demolition for renovations and extensions
  • Granny flats, garages, carports and sheds
  • Concrete driveways, slabs, retaining walls and in-ground pools

Asbestos comes out first

Queensland homes built before 1990 are likely to contain asbestos in places like roof sheeting, eaves, wet-area linings and vinyl flooring. It has to be removed by a licensed removalist before the structure comes down.

Because our asbestos team is in-house, we identify it at the site inspection, price it into one fixed quote and remove it as the first stage of the job. You get disposal receipts and an independent clearance certificate before demolition starts, and there's no waiting for a second contractor's calendar.

Approvals and council rules

Demolishing a house is building work in Queensland and needs a building approval. We arrange it as part of the job. Some areas add extra rules: in Brisbane, for example, older houses inside a character overlay usually need council approval before they can be removed. We check your property's zoning and overlays before we quote, so you know up front whether anything will affect your timeline.

How long it takes

After the site inspection you'll have a reviewed, fixed-price quote within 24 hours. Approvals and disconnections usually take 5–10 business days. Asbestos removal typically takes 1–3 days, and a typical house is down and cleaned up in 2–5 days on site. Bigger, steeper or harder-to-access blocks take longer, and we'll tell you that at the inspection, not halfway through.

Recycling and clean-up

We separate concrete, brick, steel and timber on site so as much as possible is recycled rather than sent to landfill. At handover the block is cleared and levelled, and you receive every disposal receipt and clearance certificate, which your builder, certifier or lender may ask for.

Starting prices

  • Single-storey house demolition

    From $25,000 + GST

    Standard timber or brick home on a flat, accessible block.

  • Two-storey house demolition

    From $30,000 + GST

    Standard double-storey home, full removal to slab-free site.

  • Fire-damaged, asbestos-contaminated home

    From $35,000 + GST

    Licensed asbestos removal plus demolition of the damaged structure.

See all pricing

How it runs

Real steps. Real timeframes.

  1. 01

    Enquiry

    Reply within 2 business hours

    Call, book online or send a quote request. A real person — not a call centre — gets back to you.

  2. 02

    Site inspection

    Within 48 hours

    We walk the site, identify asbestos, access, services and neighbours, and confirm your timeline.

  3. 03

    Quote reviewed & sent

    Within 24 hours of inspection

    Every quote is checked and approved by a senior reviewer before it reaches you. Fixed price, itemised, no surprises.

  4. 04

    Permits & disconnections

    Usually 5–10 business days

    We lodge the demolition permit and coordinate power, water, gas and sewer disconnections.

See the full process

FAQs

Frequently asked questions

How much does house demolition cost?

A standard single-storey house on a flat, accessible block starts from $25,000 + GST, and a standard two-storey house from $30,000 + GST. Asbestos, access, slope, and the size of slabs and driveways all affect the price. We give you a fixed, itemised quote after inspecting the site.

Do I need approval to demolish my house in Queensland?

Yes. House demolition needs a building approval, and some council areas have extra rules for older or character homes. We lodge the approval and check your overlays as part of the job.

Who arranges disconnecting power, water, gas and sewer?

We do. We coordinate every disconnection with the relevant provider before demolition starts, so the site is safe to work on.

What if my house has asbestos?

Our own Class A and B licensed team removes it before demolition, disposes of it at licensed facilities, and gives you an independent clearance certificate. It's included in the same quote.

How long does it take to demolish a house?

A typical house takes 2–5 days on site once approvals and disconnections are done (usually 5–10 business days). Asbestos removal, if needed, adds 1–3 days.

Will the site be ready for my builder?

Yes. We clear all demolition waste, level the block and hand over disposal receipts and clearance certificates on completion day.

Guides & advice

Related services

Areas we cover

Fixed-price quote. Reviewed before it reaches you.

Servicing Sunshine Coast, Brisbane and Gold Coast, and everywhere in between.

Call 0461 514 126Free quote