
Scoped after site inspection
Basement & Underground Demolition Brisbane, Gold Coast & Sunshine Coast
Below-ground work needs engineering, propping and careful sequencing. We remove slabs, footings, tanks and basements without putting neighbouring properties at risk.
What's included
One crew. Start to finish.
- Engineering & propping plans
- Slab, footing & pile removal
- Underground tank removal
- Backfill & compaction

Below-ground work needs a plan
Removing a basement, underground tank or deep footings is very different from demolishing a building above ground. The ground around the structure, and the neighbouring buildings, fences and services sitting on it, all depend on how the work is sequenced.
We plan every below-ground job with engineering input: propping where it's needed, a clear sequence for removing slabs and walls, and backfill and compaction so the site is stable when we leave.
What we remove
- Basements and below-ground car parks
- Underground water, septic and fuel tanks
- Slabs, footings, piles and pile caps
- Retaining walls and below-ground walls
- Old foundations left behind after earlier demolition
Engineering and propping
Where the work is close to a boundary or a neighbouring structure, we work with a structural or geotechnical engineer on propping and removal sequence before we start. That protects adjoining properties and keeps the excavation stable throughout. If your project already has an engineer, we work to their design.
Underground tanks
Old tanks, whether water, septic or fuel, are a common find under older homes and commercial sites. We remove them, deal with any contaminated soil around them (working with an environmental consultant where needed), and backfill the void with compacted clean fill.
Backfill, compaction and handover
Once the structure is out, we backfill and compact the area so the ground is stable for your next stage, or leave the excavation open and safe if your builder is about to start a new basement. Every job is scoped at a site inspection and quoted at a fixed price.
How it runs
Real steps. Real timeframes.
- 01
Enquiry
Reply within 2 business hours
Call, book online or send a quote request. A real person — not a call centre — gets back to you.
- 02
Site inspection
Within 48 hours
We walk the site, identify asbestos, access, services and neighbours, and confirm your timeline.
- 03
Quote reviewed & sent
Within 24 hours of inspection
Every quote is checked and approved by a senior reviewer before it reaches you. Fixed price, itemised, no surprises.
- 04
Permits & disconnections
Usually 5–10 business days
We lodge the demolition permit and coordinate power, water, gas and sewer disconnections.
FAQs
Frequently asked questions
Do you need an engineer for basement demolition?
Usually, yes. Where the work is near boundaries or neighbouring structures, we plan propping and sequencing with a structural or geotechnical engineer.
Can you remove an old underground tank?
Yes. We remove water, septic and fuel tanks, manage any contaminated soil with an environmental consultant where required, and backfill the void.
Can you remove piles and deep footings?
Yes. We remove slabs, footings, piles and pile caps as part of below-ground demolition.
Will the site be safe to build on afterwards?
We backfill and compact to leave the ground stable, or leave a safe, open excavation if your builder is starting a new basement.
How is underground demolition priced?
Every job is different, so we inspect the site first and give you a fixed, itemised quote.
Guides & advice
Related services
Areas we cover
Fixed-price quote. Reviewed before it reaches you.
Servicing Sunshine Coast, Brisbane and Gold Coast, and everywhere in between.
